JY-WB is an advanced water-based intumescent paint specifically designed for outdoor steel structures. This high-performance solution provides:

✔ 1-2.5 Hour Fire Protection - Certificado según la norma GB14907-2018
✔ Hydrocarbon Fire Resistance – Ideal for petrochemical and industrial applications
✔ Fast-Drying Formula – Enables quick spray application and rapid project completion
✔ Resistente a la intemperie - Resiste entornos exteriores adversos
✔ Ecológico – Non-toxic, low VOC, and solvent-free formulation
✔ Certificado CCCF - Cumple la estricta normativa china de seguridad contra incendios

Ideal para:
• Oil & gas facilities • Power plants • Industrial warehouses • Bridge structures

A reliable, high-efficiency choice for protecting outdoor steel structures against extreme fire hazards.

Descripción

JY-WB is a high-performance water-based intumescent paint for steel specifically designed for outdoor exposure and hydrocarbon fire protection. This environmentally friendly coating features a non-toxic, benzene-free formula that is VOC-compliant and safe for both applicators and the environment. With excellent fire resistance properties, it provides reliable protection for various structural steel profiles including H-beams in demanding industrial environments.

The coating’s fast-drying characteristics enable efficient spray application, significantly reducing project timelines while maintaining superior adhesion to properly prepared steel surfaces. Certified to GB14907-2018 standards and CCCF approved, JY-WB delivers exceptional performance in petroleum refineries, power plants, chemical processing facilities and other heavy industrial applications where hydrocarbon fire resistance is critical.

Características principales:

✔ Fast-Drying & Easy Application – Spray-applied for high efficiency
✔ Fórmula ecológica – Non-toxic, solvent-free, and low-VOC
✔ 1-2.5 Hours Fire Rating – Complies with GB14907-2018 standard
✔ Resistente a la intemperie – Withstands harsh outdoor conditions
✔ Certificado CCCF – Meets China’s stringent fire safety regulations

Ideal para: Industrial plants, power facilities, petrochemical plants, and H-beam structures.

Certificaciones y datos de ensayo

  • GB14907-2018 certificado (clasificaciones 1,0h, 1,5h, 2,0h, 2,5h)

  • Certificación de productos contra incendios de la CCCF

  • Baja conductividad térmica (probado para aislamiento térmico)

Código del productoNº de informe de ensayoDesviación máximaCapacidad de fuego real (h)Espesor (mm)Uso (kg/m²)
GT-NSP-Ft1.00-JY-WBXF220556831.7mm1.02.54
GT-NSP-Ft2.00-JY-WBXF210368738.8mm2.04.57.2
GT-NSP-Ft2.00-JY-WB (2.5h)XF220556831.6mm2.55.58.8

Surface Preparation Guidelines for Intumescent Paint Application on Steel Structures

  1. Primer Requisitos del sistema
    After sandblasting treatment, steel surfaces must be coated with a compatible anti-corrosion primer system. We recommend using the “Jinyu” brand epoxy zinc-rich primer combined with epoxy micaceous iron oxide intermediate coat to ensure proper adhesion with the intumescent paint for steel. Both primer and intermediate coats must form a continuous, defect-free film to completely seal the substrate, otherwise it may lead to delamination of the fireproof coating and substrate corrosion.

  2. Pruebas de compatibilidad de imprimaciones alternativas
    When using other primer systems, compatibility testing must be conducted either by certified laboratories or through on-site brush-out tests to verify proper bonding with the intumescent fireproof coating for steel structures.

  3. Restricciones de aplicación
    The intumescent coating must never be applied directly onto:
    ✓ Superficies de acero sin imprimar
    ✓ Recubrimientos galvanizados
    Direct application may cause coating failure and accelerated steel corrosion.

  4. Inspección previa a la solicitud
    Prior to applying the hydrocarbon fire resistant intumescent paint, thoroughly inspect for:
    ✓ Cobertura completa del cebador
    ✓ Contaminantes superficiales (polvo, residuos de aceite).
    ✓ Defectos estructurales (grietas, soldaduras inadecuadas).
    Application should only proceed after passing all inspections.

Guía de aplicación

  1. Mezcla: Stir with electric mixer; add ≤5% water if needed.

  2. Spraying:

    • Apply in crosshatch layers (1–2mm per pass).

    • First layer: ≤1.5mm thickness.

    • Drying time: 12+ horas entre capas (ajustar a la temperatura).

  3. Medio ambiente:

    • Temperatura: 15-30°C (límites: 5-35°C).

    • Humedad: ≤80%.

  4. Refuerzo: Utilice fiberglass mesh for critical areas.

Almacenamiento y transporte

  • Almacenar en lugares secos y ventilados (≥5°C).
  • Caducidad: 6 meses (evitar la humedad).

  • GT-WSP-FT-JY-WB-Intumescente exterior-Estructura de acero-Revestimiento ignífugo
    Crews applying GT-WSP-FT-JY-WB coating to exposed steel arches of a seaside stadium, achieving 150-minute fire resistance (EN 13381-8) while withstanding salt-laden winds, with real-time humidity sensors ensuring proper curing in 95% RH marine environments.
    GT-WSP-FT-JY-WB-Intumescente exterior-Estructura de acero-Revestimiento ignífugo
    Third-party inspectors measuring 20x char expansion of GT-WSP-FT-JY-WB coating after hydrocarbon fire test (UL 1709), critical for overhead pipelines at a coastal refinery where jet fire risks demand dual corrosion/fire protection.

     

    Project Case: Hainan Ocean Flower Island Fireproof Coating Application

    The Hainan Ocean Flower Island development (2018) utilized WeB and BTCB-1 fireproof coatings across 107,000 square meters of structural steel in high-humidity coastal conditions. Our solutions provided 120-minute fire resistance for resort complex structures while meeting GB 14907-2018 standards, with specialized anti-corrosion properties to withstand tropical marine environments. This large-scale tourism project demonstrates our capability to deliver aesthetic and durable fire protection for island mega-developments.

    Hainan Ocean Flower Island Project

  •  

    Project Case: Shenzhen Baoneng Tower Fireproof Coating Application

    The Shenzhen Baoneng Tower project (2021) implemented WCB, SB-3, and BTCB-2 fireproof coatings to protect critical structural elements of this 200-meter urban high-rise. Our solutions provided 180-minute fire resistance for core steel columns while meeting both GB 50016-2014 and LEED safety standards, with the WCB outdoor-grade coating system specifically engineered to withstand subtropical humidity and acid rain exposure. This project exemplifies our expertise in delivering high-performance fire protection for complex urban skyscrapers.

    Shenzhen Baoneng Building Project

Ponte en contacto

Su consulta será muy valorada y contestada en un plazo de 12 horas.

Por favor, activa JavaScript en tu navegador para completar este formulario.
REVESTIMIENTOS JINYU PAINT®, SU MEJOR ELECCIÓN