
Industrial Coatings Manufacturer & Global Flooring Solutions Contractor
A self-leveling epoxy floor coating is poured and spread with a notched trowel, then left to flow out under its own weight, so one pass leaves a seamless gloss surface instead of the lap marks a roller leaves. KAIDA PAINT® supplies it as a set of layers: an E820 body coat and a topcoat — E8300, E8302 or E8308 — with E552 as the anti-static variant. Coverage runs 0.8–1 kg/m² per pass. What decides whether the method fits is not the finish but the slab: ±4 mm per 2 m.
These are the layers that go into a resinous flooring system, supplied as one package so the mixing ratios and the inter-coat window are stated for the combination rather than for each pack on its own. Application steps are covered in the separate epoxy flooring application guide; this page is about which layers to buy. The term shifts by market — self levelling epoxy in the UK and Ireland, self-leveling epoxy flooring rather than coating in parts of North America — and the build underneath the name is the same one.
Showing all 5 results
A self-leveling build is decided by three things, and only the third one is about appearance.
| Product | Layer role | Mix A:B | Theoretical coverage | Hardness | Application temperature |
|---|---|---|---|---|---|
| E820 Epoxy Self-Leveling Intermediate Floor Coat | Body (intermediate) coat | 5:1 | 0.8–1.0 kg/m² | Not stated on the TDS | 5–35 °C |
| E8300 Self-Leveling Epoxy Floor Top Coat | Topcoat, low-VOC gloss | 5:1 | 0.8–1 kg/m² | >1H | 5–35 °C |
| E8302 Solvent-Free Self-Leveling Epoxy Floor Top Coat | Topcoat, solvent-free | 4:1 | 0.8–1 kg/m² | >2H | Above 10 °C |
| E8308 Epoxy Colored Sand Self-Leveling Topcoat | Topcoat, colored sand, slip-resistant | 6:1 | About 2 kg/m² | >2H | 5–35 °C |
| E552 Anti-Static Self-Leveling Epoxy Coating | Topcoat, conductive | 4:1 | 0.8–1 kg/m² | >2H | 5–35 °C |
Four of the five are placed at 0.8–1 kg/m² per pass, which is 80–100 kg per 100 m². E8308 carries its colored sand in the pack and goes down at about 2 kg/m², so the same 100 m² takes roughly 200 kg. Volume is set by the number of passes the duty calls for, not by the product name.
Which surface a floor needs is a separate question, answered on the epoxy top coat page. What changes here, when the topcoat is poured rather than rolled, is the volume you order, the weather window you can place in, and how the surface behaves under traffic.
For a conductive floor, E552 is not interchangeable with the three above: it needs its own anti-static primer beneath it to carry the earth path, so it is specified as a separate build and not as a topcoat option. The full conductive build is described under anti-static epoxy floor.
Self-leveling epoxy is specified from the slab first. The values below are what the E820 and E8308 data sheets require; where a project sits outside them, the coating is the wrong place to spend money.
| Substrate requirement | Value | Notes |
|---|---|---|
| Compressive strength | ≥20 MPa | E820 and E8308 data sheets |
| Tensile strength | ≥1.5 MPa | E820 and E8308 data sheets |
| Flatness | ±4 mm per 2 m | The limit that decides whether a poured floor is viable |
| Moisture content | <8% | E820 and E552 data sheets |
| Relative humidity | 35–80% typical; 35–85% for E8302 | Hygrometer reading taken on site |
| Substrate temperature | 5–35 °C for four of the five; above 10 °C for E8302 | Read from the data sheet, not assumed |
A floor outside ±4 mm per 2 m needs the slab corrected before any coating goes down — grind the high spots, or lay a leveling compound and let it cure. Above 8% moisture the coating is at risk of disbonding, so the moisture is dealt with first, by a moisture-control system or by a cementitious urethane base that tolerates it.
Four conditions move the specification off this page. Each has a system that fits it better, and we will say so at enquiry stage rather than quote a coating that will fail.
These are coats, not slab replacements. The data sheets state coverage rather than film thickness — 0.8–1 kg/m² per pass for four of the five products, about 2 kg/m² for E8308. Build thickness comes from how many passes the duty calls for, and that is set at specification: send the traffic, the chemicals and the wash-down routine, and the number of passes follows.
No. 6 mm over 3 m is outside the ±4 mm per 2 m the data sheets require, and a poured coating follows the slab rather than correcting it. Grind the high spots or lay a leveling compound first, then apply the coating over a flat base. Correcting the level with coating material costs more than correcting the slab.
E8302, where solvent odour during application would reach people working in the building. It is solvent-free with hardness >2H and dilution not recommended, and it applies above 10 °C in 35–85% relative humidity. E8300 is the low-VOC gloss topcoat, hardness >1H, thinnable up to 5% on site — the one to specify where a bright gloss and the lowest material cost per square metre lead, and where the area can be closed off while it cures.
Yes, where the wash-down is chemical and abrasive without thermal cycling — E8308 is the one specified there, because the colored sand gives grip under wet cleaning. Where the plant steam-cleans, hot-washes at temperature or runs cold rooms, the specification moves to cementitious urethane instead. The plant types we build for are listed under food and beverage processing flooring.
At 0.8–1 kg/m² per pass, 500 m² takes 400–500 kg of body coat or standard topcoat per pass. With E8308 at about 2 kg/m² the same area takes roughly 1,000 kg per pass. Add the primer as a separate line, and confirm the number of passes before the order is placed.
Yes, if the existing floor is sound, fully bonded and abraded to a profile the primer can grip. If it is lifting, blistering or contaminated with oil, it comes off first, because the new floor bonds to whatever is underneath it. Test adhesion on a small area and confirm slab moisture is at or below 8% before committing the whole area.
Yes. The primer, the E820 body coat and the topcoat are quoted together with the mixing ratios stated for the combination, so the inter-coat window and the surface preparation grade are set for the build rather than for each pack on its own.
Cost is set by the build, not by the floor area alone: the number of passes, the topcoat chosen and the condition of the slab all move it. E8308 uses roughly twice the material per square metre of E8300 or E8302, so the topcoat choice alone changes the material cost materially — and a slab outside ±4 mm per 2 m adds preparation before any coating is ordered. Send the area and the duty and we will quote the build.
Send the floor area, the flatness reading for the slab and what the floor has to resist — chemicals, temperature, traffic and wash-down routine. We will name the body coat, the topcoat and the number of passes, and come back with the pack quantities and the technical data sheets for each layer.
KAIDA PAINT® and JINYU PAINT® are brands of the same manufacturing group.
Epoxy resins, curing agents, pigments, fillers and solvents are sourced from established international chemical suppliers. Every incoming batch is inspected and released to production only after it passes the factory’s incoming-material check. Each batch record is filed so that a finished product can be traced back to the materials it was made from.
Formulations are developed and adjusted in the factory laboratory. Each production run is blended to a recorded formula with a fixed mixing ratio and mixing sequence, and the batch is checked for viscosity and gel time before it is released for filling. Formulations are tuned to specific performance targets – adhesion, chemical resistance, abrasion resistance or VOC content – rather than to a single generic specification.
Each batch is tested before packing. Testing covers the properties that determine how the coating performs on site – adhesion, abrasion resistance, hardness, gloss level and solids content – against the product’s technical data sheet. Test reports are issued per batch and can be supplied with the shipment.
Production runs on the factory’s coating lines, where the coatings are mixed in large batches and filled into pails or drums. Every container is labeled with the product code, batch number and production date, and the label carries the KAIDA PAINT® brand, so a delivered container can always be matched back to its batch record.
Color matching is carried out in-house against the factory’s standard color range. Where a project needs a specific shade, a color chip is prepared and submitted to the customer for written approval before production starts, so the delivered material matches what was approved.
Water-based and solvent-free systems are formulated to meet the VOC limits that apply in the destination market. The VOC content of each product is stated in g/L on its technical data sheet, so a specifier can check compliance against the regulation for their own project rather than relying on a general claim.
Technical support covers system selection, substrate assessment, application guidance and fault diagnosis – before, during and after delivery. Where a project requires it, application is carried out by installers, and the team that advised on the specification stays involved during application.
Orders are packed for export with the documents a project needs – technical data sheet, safety data sheet and batch test report. Packing and labeling are adjusted to the requirements of the destination market. Recent projects shipped from the factory include a 10,000 m² food plant floor in Venezuela, an industrial flooring project in Sweden, and a battery plant renovation in Hungary.
Contact: Ms. Sabella Wei
Phone: 86-022-83859963
Whatsapp: 15822925523