
Industrial Coatings Manufacturer & Global Flooring Solutions Contractor
KAIDA PAINT® epoxy flooring systems combine epoxy resin, hardener and graded aggregate fillers in a single reactive build, so the finished floor is one chemically bonded, seamless surface with no joints for water, chemicals or soil to work into.
They are engineered for floors that have to take chemical spills, impact from heavy machinery and continuous foot traffic. The bond to the prepared concrete is part of the specification rather than an assumption, which is what holds the floor in place and keeps maintenance to a minimum.
Specified as one package from primer to topcoat, our systems install efficiently, wear evenly and adapt to industrial, food, pharmaceutical and commercial interiors alike.
Where a floor has to carry live steam wash-down, thermal shock or full chemical immersion, we specify a mortar or cementitious urethane system instead, and we will say so at enquiry stage.
Showing 1–16 of 44 results
















An epoxy flooring system is built up in layers, and each layer has one job.
1. Primer – seals and prepares the concrete, and becomes the bond line between the slab and the floor.
2. Body coat – the structural layer, and the layer that carries the aggregate. Vinyl flake or coloured quartz is broadcast into the wet body coat rather than mixed into it, so the aggregate sits at the surface where traffic meets it. Flake gives a decorative pattern; quartz gives a harder, more uniform and more slip-resistant surface.
3. Topcoat – the wear layer you walk on, and the layer that takes the chemical load. It can be an epoxy, or a urethane finish over an epoxy body where the floor sees daylight.
4. Cove at the wall junction, so no open joint is left for water or soil to collect in.
That is what separates a system from a coating. A coating is a single product applied as a film; a system carries its own primer, its own aggregate and its own wear layer as part of the specification. Where a floor needs only sealing or a colour change, a coating is the lower-cost answer.
Warehouse and logistics floors, where abrasion from forklift traffic is the main load.
Garages and workshops, where hot tyre pick-up and chemical spills are the everyday wear.
Food and beverage processing, where hygiene, wet slip resistance and resistance to cleaning agents decide the finish.
Pharmaceutical, cleanroom and laboratory areas, where cleanability and chemical resistance matter more than colour.
Plant rooms, utility areas and data centres, where vapour from below is the real problem rather than traffic.
Commercial kitchens, healthcare and institutional interiors, where the requirement is a seamless, low-joint, cleanable surface.
Where a different family applies. Floors carrying live steam wash-down, thermal shock or full chemical immersion are built as a mortar or cementitious urethane system instead. Tell us the chemical and its concentration and we will say plainly which family your floor needs.
1. Test the slab – age, moisture content, surface strength and any existing coating.
2. Set the duty – the traffic, the chemicals and their concentration, the temperature, and how often the floor is washed down.
3. Choose the finish – solid colour, flake, quartz or a stone-look surface.
4. Set the thickness – from a light decorative build to a heavy double-broadcast system.
5. Detail the edges – a cove at the wall junction, and a membrane where vapour is the risk.
Skipping step one is the usual reason a floor fails. Send us the answers and we will name the build that fits your floor.
A: A coating is a single product applied as a film. A system is a complete build-up – primer, body coat with aggregate, and topcoat – specified and installed together. Where a floor needs only sealing or a colour change, a coating is the lower-cost answer.
A: It is a multi-day build rather than a one-day coat, because each layer has to be ready before the next one goes on. The exact schedule depends on the ambient temperature and on the build, and we confirm it with the quotation.
A: Over an intact, sound and well-bonded existing floor, yes, after preparation. Over a failing or lifting coating it has to be removed first, because the new floor bonds to whatever it is put on. Send photographs and we will advise before you commit.
A: Yes. A seamless system with a quartz aggregate is the usual specification where hygiene, wet slip resistance and resistance to cleaning agents are the priorities, and a cove detail is added at the wall junction so there is no joint to clean around.
A: Flake gives a decorative pattern and is the lighter, lower-cost finish. Quartz gives a harder, more uniform and more slip-resistant surface. Choose flake where appearance leads, and quartz where the floor is wet or heavily trafficked.
Send us the floor area, the substrate and its age, the traffic and the chemicals, the wash-down routine and the finish you want. We will come back with the build, the layer schedule and the price, and send the technical and safety data sheets with the quotation.
If you are not sure whether your floor needs a system or a coating, send photographs – the answer is usually clear from them.
KAIDA PAINT® and JINYU PAINT® are brands of the same manufacturing group.
Epoxy resins, curing agents, pigments, fillers and solvents are sourced from established international chemical suppliers. Every incoming batch is inspected and released to production only after it passes the factory’s incoming-material check. Each batch record is filed so that a finished product can be traced back to the materials it was made from.
Formulations are developed and adjusted in the factory laboratory. Each production run is blended to a recorded formula with a fixed mixing ratio and mixing sequence, and the batch is checked for viscosity and gel time before it is released for filling. Formulations are tuned to specific performance targets – adhesion, chemical resistance, abrasion resistance or VOC content – rather than to a single generic specification.
Each batch is tested before packing. Testing covers the properties that determine how the coating performs on site – adhesion, abrasion resistance, hardness, gloss level and solids content – against the product’s technical data sheet. Test reports are issued per batch and can be supplied with the shipment.
Production runs on the factory’s coating lines, where the coatings are mixed in large batches and filled into pails or drums. Every container is labeled with the product code, batch number and production date, and the label carries the KAIDA PAINT® brand, so a delivered container can always be matched back to its batch record.
Color matching is carried out in-house against the factory’s standard color range. Where a project needs a specific shade, a color chip is prepared and submitted to the customer for written approval before production starts, so the delivered material matches what was approved.
Water-based and solvent-free systems are formulated to meet the VOC limits that apply in the destination market. The VOC content of each product is stated in g/L on its technical data sheet, so a specifier can check compliance against the regulation for their own project rather than relying on a general claim.
Technical support covers system selection, substrate assessment, application guidance and fault diagnosis – before, during and after delivery. Where a project requires it, application is carried out by installers, and the team that advised on the specification stays involved during application.
Orders are packed for export with the documents a project needs – technical data sheet, safety data sheet and batch test report. Packing and labeling are adjusted to the requirements of the destination market. Recent projects shipped from the factory include a 10,000 m² food plant floor in Venezuela, an industrial flooring project in Sweden, and a battery plant renovation in Hungary.
Contact: Ms. Sabella Wei
Phone: 86-022-83859963
Whatsapp: 15822925523