Epoxy Flooring Systems

KAIDA PAINT® epoxy flooring systems combine epoxy resin, hardener and graded aggregate fillers in a single reactive build, so the finished floor is one chemically bonded, seamless surface with no joints for water, chemicals or soil to work into.

They are engineered for floors that have to take chemical spills, impact from heavy machinery and continuous foot traffic. The bond to the prepared concrete is part of the specification rather than an assumption, which is what holds the floor in place and keeps maintenance to a minimum.

Specified as one package from primer to topcoat, our systems install efficiently, wear evenly and adapt to industrial, food, pharmaceutical and commercial interiors alike.

Where a floor has to carry live steam wash-down, thermal shock or full chemical immersion, we specify a mortar or cementitious urethane system instead, and we will say so at enquiry stage.

KAIDA PAINT® PRODUCTS

What Is an Epoxy Flooring System?

An epoxy flooring system is built up in layers, and each layer has one job.

1. Primer – seals and prepares the concrete, and becomes the bond line between the slab and the floor.
2. Body coat – the structural layer, and the layer that carries the aggregate. Vinyl flake or coloured quartz is broadcast into the wet body coat rather than mixed into it, so the aggregate sits at the surface where traffic meets it. Flake gives a decorative pattern; quartz gives a harder, more uniform and more slip-resistant surface.
3. Topcoat – the wear layer you walk on, and the layer that takes the chemical load. It can be an epoxy, or a urethane finish over an epoxy body where the floor sees daylight.
4. Cove at the wall junction, so no open joint is left for water or soil to collect in.

That is what separates a system from a coating. A coating is a single product applied as a film; a system carries its own primer, its own aggregate and its own wear layer as part of the specification. Where a floor needs only sealing or a colour change, a coating is the lower-cost answer.

Where Epoxy Flooring Systems Are Specified

Warehouse and logistics floors, where abrasion from forklift traffic is the main load.
Garages and workshops, where hot tyre pick-up and chemical spills are the everyday wear.
Food and beverage processing, where hygiene, wet slip resistance and resistance to cleaning agents decide the finish.
Pharmaceutical, cleanroom and laboratory areas, where cleanability and chemical resistance matter more than colour.
Plant rooms, utility areas and data centres, where vapour from below is the real problem rather than traffic.
Commercial kitchens, healthcare and institutional interiors, where the requirement is a seamless, low-joint, cleanable surface.

Where a different family applies. Floors carrying live steam wash-down, thermal shock or full chemical immersion are built as a mortar or cementitious urethane system instead. Tell us the chemical and its concentration and we will say plainly which family your floor needs.

How to Specify an Epoxy Flooring System

1. Test the slab – age, moisture content, surface strength and any existing coating.
2. Set the duty – the traffic, the chemicals and their concentration, the temperature, and how often the floor is washed down.
3. Choose the finish – solid colour, flake, quartz or a stone-look surface.
4. Set the thickness – from a light decorative build to a heavy double-broadcast system.
5. Detail the edges – a cove at the wall junction, and a membrane where vapour is the risk.

Skipping step one is the usual reason a floor fails. Send us the answers and we will name the build that fits your floor.

Epoxy Flooring Systems: Frequently Asked Questions

Q: What is the difference between an epoxy floor coating and an epoxy flooring system?

A: A coating is a single product applied as a film. A system is a complete build-up – primer, body coat with aggregate, and topcoat – specified and installed together. Where a floor needs only sealing or a colour change, a coating is the lower-cost answer.

Q: How long does an epoxy flooring system take to install?

A: It is a multi-day build rather than a one-day coat, because each layer has to be ready before the next one goes on. The exact schedule depends on the ambient temperature and on the build, and we confirm it with the quotation.

Q: Can an epoxy flooring system be installed over an existing floor?

A: Over an intact, sound and well-bonded existing floor, yes, after preparation. Over a failing or lifting coating it has to be removed first, because the new floor bonds to whatever it is put on. Send photographs and we will advise before you commit.

Q: Are epoxy flooring systems suitable for food processing plants?

A: Yes. A seamless system with a quartz aggregate is the usual specification where hygiene, wet slip resistance and resistance to cleaning agents are the priorities, and a cove detail is added at the wall junction so there is no joint to clean around.

Q: How do I choose between a flake and a quartz finish?

A: Flake gives a decorative pattern and is the lighter, lower-cost finish. Quartz gives a harder, more uniform and more slip-resistant surface. Choose flake where appearance leads, and quartz where the floor is wet or heavily trafficked.

Send us the floor area, the substrate and its age, the traffic and the chemicals, the wash-down routine and the finish you want. We will come back with the build, the layer schedule and the price, and send the technical and safety data sheets with the quotation.

If you are not sure whether your floor needs a system or a coating, send photographs – the answer is usually clear from them.

How KAIDA PAINT® Coatings Are Made

KAIDA PAINT® and JINYU PAINT® are brands of the same manufacturing group.

KAIDA PAINT® COATINGS, YOUR BEST CHOICE