Name: Factory Overall Renovation Project
Location: Sweden
Duration: 27 calendar days

Project Scope

Category Quantity
Epoxy Flooring 7,000 m²
Roof Renovation 6,150 m²
Wall Renovation 4,400 m²

Material Resources

Flooring System:
  • Epoxy Primer: 1,395 kg
  • Epoxy Mid-Coat: 5,600 kg
  • Epoxy Topcoat: 2,800 kg
  • Water-Based Polyurethane Topcoat: 840 kg
  • Quartz Sand/Powder: 5,100 kg
Roof & Wall Systems:
  • Galvanized Sheet Metal Primer: Epoxy-based
  • Exterior Coating: Scratch-resistant exterior-grade clean paint

Customer Reviews

Client-Awarded-in-Epoxy-Construction

FOR AN OUTSTANDING WORKAND FINAL RESULTS!

 

The construction has been carried out by Kaida Floor, which includedpainting of ceilings as well as concretefloor renovation, grindingself-,regulating epoxy,and polyurethane top painting of a 7o00 sqndamaged and contaminated industrial floor.

 

The work was executed with a very high work ethic and perfectionexcellently representing Chinese workpride.

 

The project was characterized by a very high degree of dificulty, involvinglot of steel in the floor, floordamage, oil contamination, and signifcantunevenness. This put the products, machines, and work skills tothe test.

 

We can certify that the work was carried out above expectations, equivalentto the professional standardsof our local market. Additionally, the productsand machines delivered by Kaida provided the same excellentend result ashigh-grade European foor systems

 

We are very satisfed and give our warmest recommendation!

Client-Awarded
Sweden Factory Renovation Project Overview
Factory in Sweden
Pre-Construction_State
Post Construction Finish

Pre-Construction Assessment of Factory Flooring

Before commencing any construction work, it is imperative to conduct a thorough assessment of the factory flooring. This preliminary evaluation serves as the foundation for our epoxy flooring construction process, ensuring optimal results and long-lasting performance.

 

1. Surface Inspection: Our team meticulously examines the current condition of the factory floor surface. This includes assessing any existing cracks, unevenness, or damages that may impact the adhesion and durability of the epoxy coating.

 

2. Material Analysis: We analyze the composition of the existing flooring material to determine its compatibility with epoxy application. Understanding the substrate material helps us tailor our preparation and application techniques for maximum effectiveness.

 

3. Moisture and pH Levels: Accurate measurement of moisture and pH levels is crucial for successful epoxy flooring installation. We conduct comprehensive tests to identify any moisture issues or abnormal pH levels that could compromise the integrity of the epoxy system.

 

4. Traffic and Usage Patterns: Understanding the factory’s traffic flow and usage patterns is essential for designing a flooring solution that can withstand the specific demands of the environment. Factors such as heavy machinery, foot traffic, and chemical exposure are taken into consideration during the assessment.

 

5. Safety and Compliance: We prioritize safety and compliance with industry standards and regulations. Our assessment includes identifying any safety hazards or compliance issues related to the factory flooring, ensuring a safe working environment for all stakeholders.

 

In conclusion, our pre-construction assessment of the factory flooring enables us to develop a tailored epoxy flooring solution that meets the unique requirements of your facility. By addressing existing issues and planning accordingly, we ensure a seamless and successful epoxy flooring installation process.

Epoxy Floor Construction Process

Precision-Engineered Facility Transformation
Epoxy Flooring System & Comprehensive Envelope Renewal

Our team executed a high-performance facility upgrade integrating advanced epoxy flooring technology with full building envelope rehabilitation. The 27-day accelerated program featured:

 

1. Industrial-Grade Flooring Solution

  • Multi-layer epoxy application 
  • Chemical-resistant quartz-reinforced surface (ASTM C779 standards)
  • 98% dust suppression through mechanical substrate preparation
  • Seamless integration with existing utility penetrations

 

2. Building Envelope Modernization
Roof System:

  • Corrosion-resistant galvanized steel substrate treatment
  • 3-coat protective system with 15-year UV warranty
  • Thermal bridging elimination through continuous insulation

Wall System:

  • Substrate stabilization achieving 95% adhesion strength
  • Impact-resistant exterior coating (ISO 20567-1 certified)
  • Moisture-vapor transmission rate <0.1 perm

 

3. Precision Process Highlights

  • Phase-compliant progress documentation (daily BIM updates)
  • Real-time air quality monitoring (<1mg/m³ VOC emission)
  • 360° quality control checkpoints at critical interfaces

 

Transformative Results

  • Increased floor load capacity: 1200kg/m² → 2500kg/m²
  • Enhanced thermal performance: 35% reduction in energy leakage
  • Optimized maintenance profile: 60% reduction in surface upkeep

 

This integrated renewal strategy delivers durable performance characteristics meeting EN 13813 standards, positioning your facility for next-generation operational demands.

Floor Construction Effect

Roof & Wall Renovation Effect

JINYU PAINT® COATINGS, YOUR BEST CHOICE