Description
Product Introduction:
It has unique water resistance, strong hiding power and scrub resistance. It can be formulated in a variety of colors. The paint film is dense and semi-matte. It can effectively protect the wall and is non-toxic and odorless.
Product Features:
*This product has been certified by the China Environmental Labeling Certification Committee
*Resistant to scrubbing more than 20,000 times
*Delicate paint film, smooth feel, easy color matching
*Semi-matte effect, easy to construct
*Environmentally friendly, non-toxic and odorless
Scope of application:
It can be widely used in the decoration and protection of high-end interior walls to extend their service life.
Technical parameters Implementation standards: GB/T9756-2018, GB18582-2008
Theoretical paint consumption: 8~10 square meters/kg/two coats (calculated based on dry film thickness of 30 microns)
Drying time: 1 hour to surface dry (at an ambient temperature of 23°C and a relative humidity of 50%)
Dry for 2 hours (at an ambient temperature of 23°C and a relative humidity of 50%)
Recoating time: 4 hours (at an ambient temperature of 23°C and a relative humidity of 50%
Contrast ratio: 0.95
Scrub resistance: 20,000 times
Shelf life: 24 months from the date of production (unopened)
Reference for use:
Please read the instructions for use before construction.
Substrate: should be solid, clean, dry (moisture content ≤ 10%), PH ≤ 10; use tools such as a spatula or wire brush to powder the substrate
Remove the powdery layer and remove mildew completely.
Old paint film: Check the aging of the old paint film, and loose parts should be completely removed
Salting out: It is recommended to treat it with an oxalic acid solution of appropriate concentration (the specific concentration should be determined according to the degree of salting out, but the concentration generally does not exceed 5%), then rinse it with clean high-pressure water and dry it
Construction method: roll coating or spraying
Dilution: Add 25%~30% water
Equipment cleaning: Wash with clean water promptly after construction. Safety. Labor protection: Safety measures should be taken during construction and labor protection clothing should be worn.
Supporting system: NQ-401 “Meidi” alkali resistant primer
Packaging specifications:
6/25kg iron drum packaging
Environmental requirements:
Stored in a dry and ventilated warehouse at 5~35℃
Construction environment: temperature ≥5℃ (base temperature ≥10℃), humidity ≤85%
Transportation: Handled as non-dangerous goods, protected from freezing and exposure to sunlight