Produttore di rivestimenti industriali e fornitore globale di soluzioni per pavimentazioni
Acrylic and MMA flooring systems cure in 45 to 60 minutes per coat because they harden by chemical polymerisation rather than by water or solvent evaporation. That is the property that decides most specifications: a floor can be recoated the same shift and returned to service the same day. This page covers the thirteen KAIDA PAINT® systems built on 100% reactive MMA acrylic resin, plus the one waterborne acrylic pavement system, and the one acrylic-cement terrazzo mortar. Builds run from a 0.3 mm sealer to a 9.5 mm terrazzo. The thickness table below is the fastest way to find your system; the acrylic-versus-epoxy table answers the question most specifications start with.
Mostra tutti i risultati di 13













An MMA acrylic flooring system is a multi-coat resin floor based on methyl methacrylate monomer, cured with a peroxide initiator. Two consequences follow, and both matter more than any marketing claim.
First, the reaction is a free-radical polymerisation. It needs no water, no moisture from the slab and no ambient humidity, so the system cures at temperatures where epoxy stalls. Second, the material is 100% reactive. Nothing evaporates, so each coat reaches full film build and there is no shrinkage window to wait out.
Measured on the CrylForte systems: pot life is 10 to 20 minutes at 68 °F (20 °C), cure is 45 to 60 minutes per coat, and the service range runs from −40 °F to 212 °F (−40 °C to 100 °C).
Thickness is the first decision, because it sets the duty the floor can carry. In this range the same resin family spans a 0.3 mm sealer and a 9.5 mm mortar.
| Build | Nominal thickness | Sistema | Duty |
|---|---|---|---|
| Sealer / coating | 12–50 mil (0.3–1.25 mm) | CrylForte™ Shield | Seals concrete, stops dusting, light traffic |
| Decorative broadcast | 1/8–3/16 in (3–5 mm) | CrylForte™ Deco Quartz | Medium traffic, seamless colour |
| Self-levelling broadcast | 3/16 in (4.75–4.8 mm) | CrylForte™ Deco Flake SL, Deco Quartz SL, SL | Medium to heavy traffic, washdown |
| Terrazzo mortar | 3/8 in (9.5 mm) | CrylForte™ Terrazzo | Heavy traffic, abrasive wear, decorative aggregate |
The 9.5 mm terrazzo is the only system in this range built on acrylic resin plus cement plus aggregate. That combination carries compressive strength above 4,600 psi to ASTM C579 and is the one to specify where the floor takes steel wheels or constant abrasive wear.
Both are two-component resin floors. They differ in what stops them working.
| Condizione | MMA acrylic | Epossidico |
|---|---|---|
| Slab temperature at application | 2 to 32 °C (35 to 90 °F) | Above 10 °C for a reliable cure |
| Return to service | 45–60 min per coat; same-day handover | Typically 24 h before foot traffic |
| Moisture in the slab | Cures without slab moisture | Requires a dry slab or a moisture barrier |
| Odour during application | Strong monomer odour; plan ventilation | Low to moderate |
| Colour stability under UV | Holds colour | Aromatic grades amber |
| Cost per square metre | Higher material cost | Lower material cost |
Where the slab is warm, dry and the programme allows a 24-hour cure, epoxy is the more economical specification. Where the slab is cold, the plant cannot shut for a day, or the floor sits under UV, the MMA acrylic range is the one that holds.
| Finitura | Sistema | Where it is specified |
|---|---|---|
| Vinyl flake | Deco Flake, Deco Flake SL | Healthcare, retail, education — hides subfloor flaws |
| Coloured quartz | Deco Quartz, Deco Quartz SL | Food, pharma, heavy traffic — slip resistance built in |
| Terrazzo | Terrazzo | Heavy wear, decorative aggregate look |
| Solid colour | SL, Shield | Warehouses, factories, plant rooms |
| Stencil pattern | Concrete Stencil | External hardscape and demarcation |
| Tactile profile | Tactile Paving | Accessible routes, crossings, station platforms |
| Coloured pavement | Waterborne Polymer Pavement | Asphalt and concrete pavement, low odour |
MMA monomer has a strong odour, and that single fact rules it out of some occupied buildings. Where the work happens beside patients, residents or trading space with no way to isolate the area, specify the waterborne polymer pavement system instead: water-based, zero odour, and rated for 5+ years of colour retention under UV. Where the area can be isolated and ventilated for a shift, the MMA systems remain the faster route.
Where the requirement is a floor above 9.5 mm, a trowelled mortar or a thermal-shock rating above 60 °C, the acrylic range is not the right specification. The cementitious urethane and epoxy ranges carry those duties.
45 to 60 minutes per coat at 68 °F (20 °C), so a three-coat system is walkable the same shift. Full chemical resistance develops over 7 days.
Yes. The application window is 2 to 32 °C (35 to 90 °F), which is why these systems are specified where epoxy will not cure.
Broadcast systems such as Deco Flake and Deco Quartz use a seal coat over the aggregate. Sealers and solid-colour systems are complete at the build thickness stated in the specification.
No. Polyaspartic is an aliphatic polyurea; MMA acrylic is a methacrylate monomer cured with peroxide. Both cure fast, but acrylic works at lower temperatures and carries a stronger odour.
From 0.3 mm for a sealer to 9.5 mm for terrazzo mortar. Most industrial specifications land between 3 mm and 5 mm.
The acrylic systems hold colour better than aromatic epoxy. For exposed pavement the waterborne polymer system is specified with a 5+ year colour retention rating.
Send the slab temperature range, the traffic type and the chemical exposure. We return a system, a build-up with coat-by-coat thickness, coverage per unit and a cure schedule you can put into the programme.
Cementitious urethane systems for damp slabs and thermal shock · Epoxy flooring systems for warm, dry slabs · Polyaspartic systems for UV-stable fast cure · MMA and acrylic coatings for bridge decks and road marking · All resinous flooring systems
KAIDA PAINT® and JINYU PAINT® are brands of the same manufacturing group.
Epoxy resins, curing agents, pigments, fillers and solvents are sourced from established international chemical suppliers. Every incoming batch is inspected and released to production only after it passes the factory’s incoming-material check. Each batch record is filed so that a finished product can be traced back to the materials it was made from.
Formulations are developed and adjusted in the factory laboratory. Each production run is blended to a recorded formula with a fixed mixing ratio and mixing sequence, and the batch is checked for viscosity and gel time before it is released for filling. Formulations are tuned to specific performance targets – adhesion, chemical resistance, abrasion resistance or VOC content – rather than to a single generic specification.
Each batch is tested before packing. Testing covers the properties that determine how the coating performs on site – adhesion, abrasion resistance, hardness, gloss level and solids content – against the product’s technical data sheet. Test reports are issued per batch and can be supplied with the shipment.
Production runs on the factory’s coating lines, where the coatings are mixed in large batches and filled into pails or drums. Every container is labeled with the product code, batch number and production date, and the label carries the KAIDA PAINT® brand, so a delivered container can always be matched back to its batch record.
Color matching is carried out in-house against the factory’s standard color range. Where a project needs a specific shade, a color chip is prepared and submitted to the customer for written approval before production starts, so the delivered material matches what was approved.
Water-based and solvent-free systems are formulated to meet the VOC limits that apply in the destination market. The VOC content of each product is stated in g/L on its technical data sheet, so a specifier can check compliance against the regulation for their own project rather than relying on a general claim.
Technical support covers system selection, substrate assessment, application guidance and fault diagnosis – before, during and after delivery. Where a project requires it, application is carried out by installers, and the team that advised on the specification stays involved during application.
Orders are packed for export with the documents a project needs – technical data sheet, safety data sheet and batch test report. Packing and labeling are adjusted to the requirements of the destination market. Recent projects shipped from the factory include a 10,000 m² food plant floor in Venezuela, an industrial flooring project in Sweden, and a battery plant renovation in Hungary.
Contatto: Signora Sabella Wei
Telefono: 86-022-83859963