Installation & Supervision

| Variable | What it changes | Why it matters |
|---|---|---|
| État du substrat | How much preparation, and whether repair is needed before coating | A sound slab takes one preparation pass. A contaminated or weak slab takes milling, repair and a second profile pass, and can double the preparation time. |
| Humidité | Whether a moisture barrier or a moisture-tolerant system is required | Above the specified limit, a standard primer will blister regardless of how well it was applied. The fix is a different system, not more primer. |
| Chemistry and cure window | How long the floor is out of service | Epoxy, polyurethane, cementitious urethane, polyaspartic, polyurea and MMA have different windows before foot traffic, load and washdown. That window, not the application time, sets the downtime. |
| Area and access | Crew size, plant, and whether extraction can reach the work face | Access decides output more than area does. A 2,000 m² floor with one door and no extraction is slower than a 5,000 m² floor with a loading bay. |
| Uptime constraint | Whether the work runs in one block or in zones | Zoning converts a short intensive shutdown into a longer low-loss programme. The floor is the same; the calendar is not. |




| Country | Sector | Système | Zone |
|---|---|---|---|
| Belgium | Chemical manufacturing | Cementitious urethane | 8,100 m² |
| Espagne | Automotive parts manufacturing | Cementitious urethane | 7,200 m² |
| Pologne | Warehouse and logistics hub | Mortier époxy | 6,800 m² |
| Suède | Hospital wards and corridors | Elastomeric acoustic | 4,600 m² |
| Allemagne | Food processing facility | Water-based epoxy topcoat | 4,500 m² |
| Pays-Bas | Hypermarket, retail | Seamless quartz | 3,800 m² |
| France | Residential parking garage | Water-based resin | 1,850 m² |


Hot washdown, lactic acid, caustic and sugar break down a standard epoxy well inside its nominal service life. Cementitious urethane is the usual base because it tolerates a damp substrate and thermal shock.
Freeze-thaw and slab moisture drive delamination. Low-temperature systems are installed in a defined window with the store empty and the slab brought back to application temperature.
Acid, electrolyte and spillage attack the binder. Systems are selected by medium, concentration and contact time, not by the generic label “chemical resistant”.
Point loads at racking legs and abrasion from forklifts and AGVs. Epoxy mortar carries the load; a thin coating does not, whatever the datasheet says about compressive strength.
Oil, hydraulic fluid, hot tyre pickup and impact. Surface profile and a build that survives point impact matter more than chemical resistance here.
Cleanability of coves, joints and penetrations, plus solvent resistance. The floor is judged by what can be cleaned out of it, not by its gloss.
Wet process, pulp liquor, heat and traffic. Urethane mortar and cementitious urethane are the usual answer; the detailing at drains decides whether they survive.
Continuous moisture, sulphates and biological load. Falls to drain and a chemically resistant build are designed together, because ponding defeats both.
Night work, partial trading, and a finish that has to match a design intent. Decorative build-ups are installed in zones with an agreed handover each morning.
Infection control during works, seamless coves, and phased handover per department. Dust and extraction control are part of the method statement, not an afterthought.
Holiday windows, slip resistance in wet areas, and abrasion from furniture. The programme is built backwards from the first day of term.
Ramps, turning abrasion and tyre staining. Anti-slip broadcast on ramps, and a build that tolerates occasional ponding at the low point.
Grease, hot water, quarry tile interfaces and daily washdown. Resin replaces tile where the grout line is the hygiene problem.
Appearance retention and flatness under foot traffic. The technical decision is the topcoat; the commercial decision is how it is protected during the rest of the build.
Concourse traffic, cleaning regimes and impact. Slip classification is specified per area rather than once for the whole building.
Restricted possession windows, security clearance for crews, and a finish that must open on schedule. Mobilisation planning is the critical path.

| Condition | What it means on site | If it cannot be met |
|---|---|---|
| Separable zones | The work area can be isolated with a barrier and a separate route in and out | The work becomes a single-block shutdown |
| Extraction route | Dust and waste can leave without crossing the production area | Preparation slows sharply, and contamination risk rises |
| Independent services | Lighting, water and power in the zone can be isolated without stopping the rest | The zone cannot be released back on schedule |
| Handover by zone | Each zone is signed off and returned before the next one opens | Zones overlap, and the programme collapses into a full stop |
| Check | Reference method | What it proves |
|---|---|---|
| Substrate moisture | In-situ relative humidity probe, ASTM F2170 | That the slab was inside the moisture limit when the system was applied |
| Tensile adhesion | Pull-off test, ASTM D4541 | That the system is bonded to the substrate, and where it fails if it does |
| Dry film thickness | Gauge measurement, SSPC-PA 2 / ISO 19840 | That the specified build was actually applied, not just quoted |
| Cure state | Shore D hardness, ASTM D2240 | That the floor has cured to the state in which it may take load or washdown |
| Résistance au glissement | DIN 51130 ramp test, or ANSI A326.3 DCOF | That the area meets the class specified for its wet or dry use |
| Detailing and finish | Visual and tactile inspection against the detail checklist | That coves, drains, joints and penetrations can be cleaned — the actual hygiene requirement |


Yes, if the plant can be split into zones that are isolated from each other. Phasing trades calendar time against lost production: it almost always takes more days and almost never takes more downtime. What decides whether it is possible is extraction and access, not the floor system. Where a plant has a single entrance or a continuous process, one short shutdown is the better answer.
Supervision is offered for KAIDA PAINT systems. If the material on site is a third-party system, we can carry out a condition survey and an independent QA inspection, but we do not issue a workmanship warranty on another manufacturer’s product.
Duration is set by substrate preparation, moisture, the cure window of the chosen chemistry and how the site can be phased. A single-zone floor is usually a continuous programme of preparation, build-up, detailing and cure; a multi-zone refurbishment is longer in calendar days but shorter in lost production. We issue a programme with the quotation, not after it.
Mechanical preparation to a defined concrete surface profile, usually by shot blasting or diamond grinding, followed by crack and joint repair and a moisture assessment. Adhesion depends on the profile and on the substrate being sound and dry to the specified limit; no primer compensates for a weak or contaminated surface.
Six checks are normally recorded: substrate moisture before work, tensile adhesion by pull-off, dry film thickness, Shore D hardness or cure state, slip resistance, and a visual inspection of detailing at coves, drains and joints. Pass criteria are fixed in the project specification before work starts.
Responsibility follows the contract. In the supply-and-install model one party carries material and workmanship. In the supervision-only model the applicator carries workmanship and KAIDA PAINT carries the material; the supervisor’s signed stage records are what separates the two.
Yes, with a low-temperature system and a defined shutdown window for the slab to reach the application temperature. Freezer work is scheduled around defrost and re-cooling, and the slab moisture must be verified after the store is emptied.
Yes. Local applicators — an epoxy flooring contractor, a resin trade or your own maintenance crew — are used for labour, plant and logistics where they meet the method statement, with a KAIDA PAINT supervisor on site for the critical stages. This is the usual structure for repeat programmes and for distributors building their own installation capacity.
Area and a simple plan, substrate type and age, the chemicals and temperatures the floor will see, the current floor condition and photographs, the production window you can release, and the acceptance standard your client or auditor will apply.
Food and beverage processing, cold storage and blast freezers, chemical and battery plants, warehouses and distribution centres, automotive workshops and assembly, pharmaceutical and cleanroom facilities, and commercial spaces including retail, hospitals, schools, car parks and stadium concourses.
Pour des solutions de revêtement de sol industriel sur mesure, contactez KAIDA® JINYU PAINT® dès aujourd'hui.
Nous offrons des conseils gratuits et sans obligation d'achat et pouvons fournir une fourchette de prix dès le premier contact.
Contact : Mme Sabella Wei
Téléphone : 86-022-83859963
Whatsapp : 15822925523