An epoxy floor primer is the first coat of an epoxy floor system. Its job is narrow and essential: seal the prepared concrete, consolidate a dusty or absorbent surface, and provide the bond that every following coat depends on. The finish coat can only perform as well as the layer beneath it.
KAIDA PAINT® supplies five epoxy floor primers — penetrating, water-based, solvent-free and anti-static types. This page sets out which substrate each one suits, the site conditions they share, and when a primer can be left out. The layers that follow the primer are covered on the epoxy mid-coat و eoxy floor top coat pages.
عرض 5 من كل النتائج





An epoxy floor primer (also called an epoxy primer, or a primer sealer) does three things, in this order:
A primer is not a sealer in the moisture-barrier sense. It does not replace a waterproof layer or a damp-proof membrane on a slab that is still giving off moisture.
| النوع | المنتج | What it is for |
|---|---|---|
| Penetrating | طلاء أولي إيبوكسي E159X (نوع مخترق) | Absorbent, chalky or lightly dusty slabs, where the primer has to soak in before it can bond |
| Water-based | إيبوكسي تمهيدي إيبوكسي مائي الأساس E156 | Occupied buildings and odour-sensitive sites, where a water-borne primer is preferred |
| خالي من المذيبات | برايمر الإيبوكسي التمهيدي الخالي من المذيبات E811 | Solvent-free builds where the primer must match the rest of the system |
| Primer and mid-coat in one | الطلاء التمهيدي للأرضيات الإيبوكسي الخالي من المذيبات E811-2 طلاء الأرضيات الإيبوكسي التمهيدي الأوسط | Builds that combine the sealing and build coats to reduce the number of site operations |
| مضاد للكهرباء الساكنة | طلاء الأرضيات الإيبوكسي التمهيدي المضاد للكهرباء الساكنة | ESD-protected areas, where the conductive path has to start at the primer layer |
The choice between a penetrating and a film-forming primer follows from how dense the slab is, not from the finish coat you intend to apply.
| Penetrating primer | Film-forming primer | |
|---|---|---|
| How it works | Soaks into the pore structure and consolidates the surface from within | Forms a continuous film on the surface that the build coats bond to |
| Suits | Open, absorbent or dusty concrete | Dense, power-troweled or low-absorption concrete |
| In our range | طلاء أولي إيبوكسي E159X (نوع مخترق) | E156 Water-based Epoxy Primer, E811 Solvent-free Epoxy Primer |
| Tell-tale sign you picked wrong | Primer sits on the surface as a glossy film on an absorbent slab | Primer disappears into the slab and leaves a dry, starved surface |
| الحالة | Requirement |
|---|---|
| Substrate concrete strength | ≥ C20 |
| Substrate moisture content | ≤ 8% at application; a waterproof layer is required |
| Application temperature | 5–30 °C |
| Relative air humidity | 30–85% |
| تحضير السطح | Sound, clean and dry, with the surface profile set by the system build (see the ICRI CSP guide in our technical articles) |
Scope: a separate primer coat is needed on most projects. It can be omitted only in these cases:
In every other case — absorbent concrete, dusty surfaces, slabs with residual moisture, or any system where the first coat must seal before it builds — a primer is required.
On most concrete floors, yes. A primer is only skippable when the build uses a combined primer / mid-coat product, or when the slab is dense and already coated with a compatible, abrasion-prepared system that has passed an adhesion test.
A penetrating primer soaks into the concrete and consolidates the surface from within; it suits open, absorbent or dusty slabs. A film-forming primer stays on the surface as a continuous film that the build coats bond to; it suits dense, power-troweled or low-absorption slabs.
No. Substrate moisture content must be at or below 8% at the time of application, and a waterproof layer is required. A primer is not a moisture barrier — it will not stop a slab that is still giving off moisture from pushing the system off from below.
Anti-static builds use a dedicated conductive primer, listed above as Epoxy Anti-Static Floor Coating Primer. The conductive path has to begin at the primer layer, so the primer and the rest of the ESD system must be specified together.
Coverage, recoat window and substrate requirements for each epoxy floor primer, including the penetration grade and the mixed-viscosity data you need to specify the right type. Tell us the slab condition — age, absorption and moisture reading — and we will recommend the primer.
KAIDA PAINT® and JINYU PAINT® are brands of the same manufacturing group.
Epoxy resins, curing agents, pigments, fillers and solvents are sourced from established international chemical suppliers. Every incoming batch is inspected and released to production only after it passes the factory’s incoming-material check. Each batch record is filed so that a finished product can be traced back to the materials it was made from.
Formulations are developed and adjusted in the factory laboratory. Each production run is blended to a recorded formula with a fixed mixing ratio and mixing sequence, and the batch is checked for viscosity and gel time before it is released for filling. Formulations are tuned to specific performance targets – adhesion, chemical resistance, abrasion resistance or VOC content – rather than to a single generic specification.
Each batch is tested before packing. Testing covers the properties that determine how the coating performs on site – adhesion, abrasion resistance, hardness, gloss level and solids content – against the product’s technical data sheet. Test reports are issued per batch and can be supplied with the shipment.
Production runs on the factory’s coating lines, where the coatings are mixed in large batches and filled into pails or drums. Every container is labeled with the product code, batch number and production date, and the label carries the KAIDA PAINT® brand, so a delivered container can always be matched back to its batch record.
Color matching is carried out in-house against the factory’s standard color range. Where a project needs a specific shade, a color chip is prepared and submitted to the customer for written approval before production starts, so the delivered material matches what was approved.
Water-based and solvent-free systems are formulated to meet the VOC limits that apply in the destination market. The VOC content of each product is stated in g/L on its technical data sheet, so a specifier can check compliance against the regulation for their own project rather than relying on a general claim.
Technical support covers system selection, substrate assessment, application guidance and fault diagnosis – before, during and after delivery. Where a project requires it, application is carried out by installers, and the team that advised on the specification stays involved during application.
Orders are packed for export with the documents a project needs – technical data sheet, safety data sheet and batch test report. Packing and labeling are adjusted to the requirements of the destination market. Recent projects shipped from the factory include a 10,000 m² food plant floor in Venezuela, an industrial flooring project in Sweden, and a battery plant renovation in Hungary.